Smart city fiber optic infrastructure
Urban surveillance and traffic monitoring fiber solutions

Friday, 1st March 2024 By 14h30 Namibian Time

Browse technical resources about fiber optic infrastructure for smart cities, surveillance, and IoT.

  • Temporary power distribution box inspection time

    Temporary power distribution box inspection time

    Temporary electrical installations should be inspected daily by users for obvious defects, with more thorough inspections conducted weekly by a competent person. Complete system inspections should be performed quarterly or when significant changes are made to the system. This temporary electrical distribution safety checklist template helps site managers and electricians confirm that temporary power supplies are installed and maintained safely on construction sites. It covers essential areas such as risk assessment, competent personnel, cable routing and mechanical. An RCD or ELCB is to be installed to all final distribution boards and tested before use on each shift. To allow only the use of 110 volt for portable electric tools. Using a checklist ensures that the systems used are, though temporary, safe, code-compliant and suitable to be used within any. Follow detailed inspection guidelines below. Give specific attention to areas in which PDI employees are working or WILL be working. Grounding conductors should get weekly.

    [PDF Version]
  • Short operating time of relay protection

    Short operating time of relay protection

    The operating time of definite time relays does not depend on the magnitude of the fault cur-rent, while the operating time of inverse time relays is shorter the higher the fault current magnitude is. These calculations are critical in industrial. Instantaneous Overcurrent Protection (IOCP) is a protection scheme used in power systems to rapidly clear short-circuit faults. Its defining feature is zero intentional time delay (or minimal delay), with typical operating times of 20–50 ms, complying with IEC 60255-151 (Overcurrent Protection. The relay is connected to the circuit to be protected via CTs and VTs according to the required protection function. In order for the relay to operate, it needs to be energized. This energy can be provided by battery sets (mostly) or by the monitored circuit itself. Instantaneous units should be set so they do not trip for fault levels equal or lower to those at busbars or elements protected by downstream instantaneous relays. set to clear. Protective relays and devices have been developed over 100 years ago to provide “last line” of defense for the electrical systems. The selection and applications of.

    [PDF Version]
  • Continuous use time of optical power meter

    Continuous use time of optical power meter

    An increasingly common special-purpose OPM, commonly called a "PON Power Meter" is designed to hook into a live PON () circuit, and simultaneously test the optical power in different directions and wavelengths. This unit is essentially a triple power meter, with a collection of wavelength filters and optical couplers. Proper calibration is complicated by the varying duty cycle of the measured optical signals. It may have a simple pass/ fail display, to facilitate easy use by operators wit.


More industry information

Contact Us

We Look Forward to Working with You

Contact Information

Phone +49 172 6389472
Address Musterstraße 12, 10115 Berlin, Germany

Send an Inquiry